Space Mountain Major Refurbishment

    44
    • Queue games added
    • Exterior signage changes
    • Track smoothing
    • New graphics package during load/unload and lift hill
    • Enhancements to starfield projection
    • Enclosed loading area
    • Air gates at lift area
    • Removal of glow in the dark stripe on vehicles
    • Post show modifications
    • Estimated cost of the refurbishment: $12.3 million