Main Street USA Pavement Replacement

135

WDWMagic.com is reporting that the pavement on Main Street USA will be replaced in a project that begins on July 23rd. It is expected that this will continue through late September.

During the pavement replacement entrances to shops are expected to be blocked and during the first week the front entrance of the Emporium and the Sorcerer's of the Magic Kingdom are both expected to be blocked.