Epcot Updates: Soarin’, Living with the Land, Frozen Attraction

106

OrlandoParksNews.com is reporting several updates form around Epcot.

Living with the Land

Living with the Land recently had an audio upgrade and several other small changes are also taking place around the attraction.

  • The sliding doors that lead tot he greenhouses are missing. Per Orlando Parks News, the doors are expected to return before the end of the year. Per the site, the possibility of delays still exist.
  • A new water feature has been added to the first greenhouse
  • The cast member that appeared in the corner leading into the greenhouses will soon be relocated to a backstage location.

Soarin'

Work has reportedly begun for the third theater for Soarin'. A large area behind the attraction is now considered a construction zone. The area has been walled off. Previously, this area was used for parking for the Food and Wine Festival. The timing resulted in work not starting earlier.

Frozen Attraction (Norway Pavilion)

Reportedly the building next to the former Maelstrom attraction is being used to store material for the project. Orlando Parks News has speculated that it doesn't appear the pavilion will be expanded further.